Lee E. Tansey, P.E., P.S.   

Projects

 

Fairfield Angling Road

Fairfield Township - between Delta Road and Edwards Road

100% State Funded 

30 ft. span over Branch of Huron River

Contractor: R & I Construction

Cost: $389,000

Completed June 2017

 

 

Photos from the  Fairfield Angling Road project. 

 

Omega Road

Greenwich Township - between SR13 and Rome Greenwich Road

Funding: 95% Federal, 5% Local

88 feet span over the Southwest Branch of the Vermilion River

Contractor: Crawford Construction

Cost: $437,500

Completed July 2017

 

Plymouth East Road Bridge

New Haven Township - Between SR 61 and Mills Road

Funding: 100% State

60 feet span over Branch of Huron River

Contractor: R & I Construction

Cost: $473,000

Construction Begins: July 2017

 

Peru West Section Line Bridge Replacement

February 23, 2023

 The Huron County Engineer seeks comments on a Bridge Replacement Project (HUR CR 065 – 02.11) PID 119355 on Peru West Section Road over the Huron River in Peru Township.

The Huron County Engineer’s Office is planning on replacing a bridge on Peru West Section Line Road over the Huron River west of Hettle Road.  The single span through truss bridge was built in 1954 and is in poor condition with weight restrictions. The proposed replacement will consist of prestressed concrete box beam superstructure on capped pile concrete abutments.

The proposed project is located within a Special Flood Hazard Area of the Huron River.  Best management practices for sediment and erosion control will be used throughout construction to ensure that impacts to the floodplain are minimized. A No-Rise Certification will be made by a Registered Professional Engineer.

Construction is currently scheduled to begin in spring of 2026 at an estimated construction cost of $2,200,000 with work lasting approximately 150 days.

Written comments concerning the proposed project may be mailed to Huron County Engineer’s Office, ATTN: Lee Tansey, 150 Jefferson Street, Norwalk, Ohio 44857. 

You may also contact Lee by phone (419) 668-1997 or by email ltansey@huroncountyengineer.org.  Any comments must be received by March 29, 2024.

The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being, or have been, carried-out by ODOT pursuant to 23 U.S.C. 327 and a Memorandum of Understanding dated December 11, 2015, and executed by FHWA and ODOT.